Residential Building Permit Fees
Development Permit | $250.00 |
HOUSING BUILDING PERMITS FOR SINGLE FAMILY DWELLINGS, TWO FAMILY DWELLINGS, AND MULTI-UNIT RESIDENTIAL DWELLINGS SUBJECT TO PART 9 OF THE BUILDING CODE AND NOT REQUIRING AN OCCUPANCY PERMIT. |
|
Single Family Dwellings | $0.50/sq. ft. for finished space $0.30/sq. ft. for unfinished space |
Multi-residential dwellings | $0.50/sq. ft. |
Detached garage or accessory building |
|
| $180.00 |
| $180 + $0.30/sq. ft. |
Basement development – includes plumbing | $0.50/sq. ft. |
Outside swimming pools | $150.00 |
Temporary Structure Permit (per unit) | $100.00 |
Demolition Permit | $100.00 |
Commercial Building Fees
Development Permit | $500.00 |
NEW CONSTRUCTION, ADDITIONS AND ACCESSORY STRUCTURES – ANY CONSTRUCTION OTHER THAN SINGLE FAMILY AND TWO-FAMILY DWELLINGS UNDER 6,4588.4 SQ. FT. IN BUILDING AREA, NOT EXCEEDING 3 STOREYS IN BUILDING HEIGHT OR MULTI-UNIT RESIDENTIAL DWELLINGS SUBJECT TO PART 9 OF THE BUILDING CODE AND NOT REQUIRING AN OCCUPANCY PERMIT |
|
Base application and review fee plus classification | $500.00 |
Group A — Assembly Occupancy | $1.70/sq. ft. |
Group B – Care, Treatment or Detention Occupancy | $2.30/sq. ft. |
Group C – Residential Occupancy | $1.40/sq. ft. |
Group D – Business & Personal Services Occupancy | $1.50/sq. ft. |
Group E – Mercantile Occupancy | $1.10/sq. ft. |
Group F1 – Industrial Occupancy | $1.50/sq. ft. |
Group F2 – Industrial Occupancy | $1.10/sq. ft. |
Group F3 – Industrial Occupancy | $1.00/sq. ft. |
Accessory structures defined in the Building By-Law that can be measured in terms of area. | $1.00/sq. ft. |
Temporary Structure Permit (per unit) | $100.00 |
Occupancy Permits | $250.00 |
Sign Permits | $100.00 |
Plumbing Permit
Residential Plumbing Permit | $50.00 per fixture |
Industrial and Commercial Permit | $50.00 per fixture |
Sewer and Water Connection
Connection Fee 5/8 Inch Meter | $950.00 |
Connection Fee Larger than 5/8 Inch Meter | Per cost basis |
Driveway Access Permit
Open Ditch or Storm Drain (includes up to 18” diameter culvert 6 meter crossing) | $2500.00 |
Commercial (if approach installed by property owner/builder) | $1000.00 |
Commercial (if approach installed by the municipality) | $500.00 + costs |
Subdivisions with rolled curb | $150.00 |
Lot Grading Permits
Residential lot | $100.00 |
Other than residential lot | $500.00 |
Refundable Deposits Required for Construction
A refundable deposit of $5000.00 will be held until all elements of construction are completed, including Lot Grading, Road damage, Sewer and Water installation to municipal standards.
For pool permits a refundable deposit of $1000.00 will be held until completed, including Lot Grading, fencing and lockable gate, final pool and damage inspection.
Please note above fees may be subject to change and additional fees may be added. Please contact Development Officer for further information. Please contact Manitoba Hydro for all electrical permits.
Additional Fees
Where a permit has not been obtained prior to the commencement of the actual work through neglect or some other reason the fees shall be double the normal rate for the work done up to the date the permit was issued.
For each re-inspection of an installation made at least one week after the permittee has been notified of a defect in installation and where upon such subsequent re inspection if found that the defects have not been remedied a fee of $150.00 shall be paid for the 1st hour plus $75.00 for each hour after.